Projects:
Bjarkoya Bridge
Poland
EMJ were contracted to provide Permadec panels of different lengths to accommodate the variation in shape of the bridge deck at different intervals. This involved the design and manufacture of 310 different 3B.6 panels (4.22m and 2.82m lengths). We also provided 95 skewed panels with different panel lengths and a total area of 251.6m2.
The total m2 required for the project was 1200m2 of formwork. These were shipped from our factory in the UK in 3 separate orders to arrive on site when installation could take place. Space and storage were restrictive so the deliveries were staggered to meet the client and contractors requirements. The bridge consisted of 3 separate sections which were approx. 100m in length each. After preloading of our formwork they were then shipped to their final destination in Norway by barge for final placement and completion.
Project: Bjarkoya Bridge
Main Contractor: Implenia/Doka
Employer: Statens Vegvesen
Engineering Consultancy: Ramboll AS Norge
Stage: Completed
Standard
Haunched
Cantilever
Complete Solution
Get in touch
For more information please contact one of our sales advisors on +61 2 9052 4975 email at sales@permadec.com.au or fill our this form.