Projects:
Majors Road Interchange
Adelaide, South Australia
Permadec was engaged in the Majors Road Interchange project in Adelaide, working alongside the Department for Infrastructure and Transport, Acciona, and WGA to supply over 800m² of GRP permanent formwork. This innovative formwork solution enhanced onsite efficiency, reduced costs, and accelerated installation.
Scope of Work
- Skewed Panels for Structural Alignment: Standard panels were skewed to suit the alignment of the structure, minimising onsite modifications and optimising installation.
- A1 Type Panels for Seamless Integration: A1 type panels were supplied to be installed between the existing structure and the new structure, ensuring a smooth transition and structural consistency.
- Innovative Cantilever Panel Design: Permadec cantilever panels were designed and supplied with an upstand, eliminating the need for additional edge formwork. These panels required no support from beneath, significantly improving efficiency.
Project Benefits
- Enhanced Onsite Efficiency: The use of cantilever panels reduced material requirements and labour costs.
- Rapid Installation: All panels were installed in just four days, an exceptionally fast turnaround.
- Minimal Equipment Requirement: 90% of panels were installed manually, reducing reliance on heavy machinery and improving site accessibility.
By collaborating with the Department for Infrastructure and Transport, Acciona, and WGA, Permadec played a key role in the successful delivery of the Majors Road Interchange, contributing to a more efficient and cost-effective construction process.
Project: Majors Road Interchange
Client: Department for Infrastructure and Transport South Australia
Main Contractor: Acciona
Engineering Consultancy: WGA
Stage: Delivered