The new Fremantle Traffic Bridge replaces the ageing 1939 timber crossing over the Swan River. It is Australia’s first extradosed bridge and Permadec’s first delivery to a Main Roads Western Australia project.

Permadec designed and supplied GRP permanent formwork across the full bridge deck, seated onto precast TeeRoff girders. 14 distinct panel types were engineered across 40 bays, with each bay requiring its own arrangement to suit the TeeRoff geometry.

Panels were colour-matched to RAL 7044 (Silk Grey), packed to the contractor’s installation sequence, and detailed with a bolted GRP flat bracket sealant system at TeeRoff/edge-segment junctions to prevent grout loss to the Swan River.

Key Facts

  • > 3,000 m² GRP formwork delivered
  • Up to 3.7 m panel spans / 300 mm in-situ deck
  • 14 bespoke panel types across 40 bays
  • First Permadec delivery to a Main Roads WA project

Project: Fremantle Traffic Bridge

Client: Main Roads Western Australia

Main Contractor: Laing O’Rourke

Engineering Consultancy: Arup / WSP

Stage: Completed

Products Supplied

Bespoke Standard Panels

14 panel types across 40 bays, spanning up to 3.7 m between TeeRoff supports.

Site-Adjustable Cantilever Detail

Maximum 150mm cantilever at each bay end to absorb TeeRoff manufacturing tolerances on installation day

Bolted GRP Flat Brackets

Installed at TeeRoff/edge-segment junctions to seal against grout loss to the Swan River during the deck pour.

Project Highlights

  • Over 3,000 m² of Permadec GRP permanent formwork
  • 14 bespoke panel types across 40 bays
  • Panel spans up to 3.7 m, carrying a 300 mm in-situ concrete deck
  • Packed and sequenced to the contractor’s installation programme
  • Colour-matched to RAL 7044 (Silk Grey)
  • First Permadec delivery to a Main Roads Western Australia project
  • Australia’s first extradosed bridge

Specifying GRP permanent formwork on a bridge or infrastructure project? Our engineering team is available to discuss.

+61 2 9052 4975 | sales@permadec.com.au | permadec.com.au

GRP permanent formwork panel installed between steel bridge beams, supporting reinforcement and concrete slab – lightweight glass reinforced polymer formwork system by Permadec.

Standard

GRP permanent formwork panel installed between steel bridge beams, supporting reinforcement and concrete slab – lightweight glass reinforced polymer formwork system by Permadec.

Haunched

Cantilever

Cantilever

Complete Solution

Complete Solution

Get in touch

For more information please contact one of our sales advisors on +61 2 9052 4975 email at sales@permadec.com.au or fill our this form.

  • Drop files here or
    Accepted file types: jpg, png, pdf, doc, docx, ppt, pptx, xls, xlsx, Max. file size: 10 MB.

    Consent & Personal Data
    By completing this form, you agree that your personal details provided may be used to provide you with details of our services, upcoming events and other news stories we feel would be beneficial to you in writing, by email or by telephone. We will only keep details of your personal data provided and will never pass this onto third parties without your prior agreement. This information will be deleted from our records at your request at any time. By visiting our website, you are voluntarily choosing to provide certain personal details to us as outlined in our Privacy & Cookies Policy. Any personal information submitted through our site or sign up forms will be held in accordance with the Data Protection Act 2018 and as per the General Data Protection Regulations which came in to force in May 2018. Please refer to our Privacy & Cookies Policy here.